Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | cycle, lee, valley, way |
Date time: | 9.29am, Friday 18th November, 2011 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | kevins299 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Tower Hamlets |
The new underpass at Bow interchange. brings you out on the right hand side of the canal.
Comments reflect the views of the original submitter only.