Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Non-specific |
Tags: | and, cambridge, clips, cyclepath, cycling, examples, newmarket, park, ride, road, video |
Date time: | 1.00pm, Wednesday 15th February, 2012 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | radwagon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
See clip at www.youtube.com/watch
After a couple of weeks from clip www.youtube.com/watch there's been some change! Notice that hedges have been cut to the right at 26 and 45 seconds. Much better visibility now!
That's started working on my point 3 from the other clip. A small step forward but in the right direction. Although, I have no idea whether this will all grow back up again in a few months.
"3. Reduce the hedges to enable visibility and straighten the route through the central area, retaining pedestrian segragation."
Comments reflect the views of the original submitter only.