Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | cambridge, cherry, clips, cyclelane, cycling, examples, hinton, unusable, video |
Date time: | 1.00pm, Thursday 1st March, 2012 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | radwagon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
See clip at www.youtube.com/watch
Road works have been ongoing in the past few weeks here. After it's finished, the cyclelane is left covered with mud and puncture-creating debris. Thus is completely unusable.
Comments reflect the views of the original submitter only.