Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | layby, ncn1 |
Date time: | 7.53pm, Monday 4th June, 2012 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | simon |
Copyright: | Public domain |
Download: | View full-size original |
Area: | Canterbury |
Heavy and busy traffic on the road here make this cycleway a rather depressing cycle ride.
This lorry was in the layby two days running and the rear wheels of the trailer unit seemed to be locked up with a green cable lock which seemed extremely flimsy for such a big vehicle.
Comments reflect the views of the original submitter only.