Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | batemen, contraflow, lane, roadworks, street |
Date time: | 10.26pm, Friday 20th July, 2012 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | radwagon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Temporary roadworks in the contraflow cyclelane. Nearby signs suggests it's only for a day, but will check.
Note that to pass this obstruction legally, anyone cycling has to dismount and walk along the pavement. The roadway is one-way the other way.
Yeah, I don't like it either. Roadworks have to take place but there needs to be better controls around a complete closure of the cyclelane.
Comments reflect the views of the original submitter only.