Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | billy, hayling, ncn22 |
Date time: | 1.04pm, Sunday 5th August, 2012 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | stevepo16 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Havant Borough Council |
Area: | Emsworth |
Despite signage to the contrary, this small section of the Hayling Billy Trail is actually NCN22 (NCN2 will in future join the Trail from the east, behind the photographer, on a new path crossing Warblington School playing fields). The woods to the right (north) are due to be built on soon. The railway gates are a replica of the original gates which were removed in 1963 when the branch line railway closed. The mess is due to grass cutting by Havant Council which was in progress on the day of the photo!
Comments reflect the views of the original submitter only.