Category: | Cycleway: A problem that needs to be fixed |
Tags: | stanmorethames19aug |
Date time: | 11.35am, Sunday 19th August, 2012 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | anoopshah |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Harrow |
Belmont Trail at Belmont Circle car park. Instead of going straight through the car park, it does a U turn and goes up a ramp.
Comments reflect the views of the original submitter only.