Add to Gallery: | Add this photo to a Gallery |
Category: | A narrow place, difficult for cycles to pass.: Non-specific |
Tags: | absolutebollards, barrierstocycling, canal, covid19, gmcc, manchester, metrolink, peel, peelholdings, salford, towpath |
Date time: | 12.11pm, Friday 31st August, 2012 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | riccardo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Salford |
UPDATE JUNE 2020 THIS HAS BEEN FENCED OFF AGAIN!!! safestreetstrafford.commonplace.is/comments/5ec6b01fe000835c3a24278d UNTILL THIS IS REOPENED THE TEMPORARY CYCLE PATH ON THE DUAL CAARRIAGEWAY SHOULD STAY twitter.com/Cyclinstructor/status/1269525765055447041 Access from Cornbrook Road onto the Cornbrook Bridge over the Bridgewater Canal this was part of my suggested temporary diversion for the towpath obstruction with #44690. Closure is for 2 months from 20 August 2013 see #44689 and #44687
This is the route I took to divert bikeroutetoaster.com/Course.aspx but this uses some steep steps.
Comments reflect the views of the original submitter only.