Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | batemanstreet |
Date time: | 9.37am, Thursday 20th December, 2012 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
How are they going to resurface this flooded cycle lane?
Comments reflect the views of the original submitter only.