Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | airportcycleroute, glasgowairport, junction, paisley, trafficsignals |
Date time: | 3.01pm, Saturday 26th January, 2013 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
Cyclists have not been considered in the revised road layout. These traffic signals have been installed without any provision being made for the cycle route, possibly because there wasn't any special provision before the junction was signalised. "Cyclists use crossing" and it's not even a toucan crossing.
Comments reflect the views of the original submitter only.