Add to Gallery: | Add this photo to a Gallery |
Category: | A route temporarily barred to cycle access.: Event or temporary issue |
Tags: | anglain, ay07, ay07-bpe, ay07bpe, blocked, bpe, cyclepath, signage, water |
Date time: | 1.20pm, Wednesday 27th March, 2013 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | radwagon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
This short cyclepath is to get from the road the photo is taken from to the crossing (lights obscured by the AY07 BPE Anglian Water van).
Note that the signs and van are in the cyclepath and no restriction of it is signed. I believe the requirement is to provide alternative cyclepath or (the loophole option to) mark it is closed.
Also note that there isn't any work going on in the cyclepath at all, the work is allocated for the road after the crossing.
11/04/13 UPDATE: Lots of resurfacing work has taken place along the pavements all around making much nicer for people walking (now not sure why the Anglian Water connection?). Note that NOTHING has happened to the cracked and lumpy cyclepath.
Comments reflect the views of the original submitter only.