Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | northcircular, stonebridgepark |
Date time: | 1.38pm, Friday 22nd March, 2013 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Brent |
Route to cycle bridge (at rear) over the North Circular Road.
Comments reflect the views of the original submitter only.