Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: A problem that needs to be fixed |
Tags: | droppedkerb, kerb, loadingbay, resurfacing, upstand |
Date time: | 2.22pm, Tuesday 16th April, 2013 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Not only is there vertical upstand left at dropped kerb after resurfacing, but now the road markings have been reinstated with a loading bay marked over half of the dropped kerb!
Comments reflect the views of the original submitter only.