Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | track |
Date time: | 2.42pm, Sunday 7th April, 2013 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | mikeclark |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Mike Clark |
Area: | Godmanchester |
Improvements to the riverside route between Houghton and St Ives. The path has been widened, levelled and resurfaced.
Comments reflect the views of the original submitter only.