Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Other (infrastructure-related) |
Tags: | meadows, trumpington |
Date time: | 2.50pm, Sunday 9th June, 2013 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | kbrumann |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Klaas Brumann |
Area: | Cambridge |
Trumpington Meadows by Barratt Homes. Phase 1 with 350 dwellings is scheduled to be completed by the end of 2014. Total 1,200. Apparently no access from here, though further up the "Except Authorised Vehicles" section it indicates two way cycling, with the southbound access impeded.
Comments reflect the views of the original submitter only.