Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | path, vegetation |
Date time: | 11.43am, Tuesday 25th June, 2013 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cumbernauld |
Overhanging vegetation narrowing path on ramp down from A8 bridge across from Eurocentral
Comments reflect the views of the original submitter only.