Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | addenbrookes, cambridge, clips, cycling, examples, genome, path, removed, route, segregated, temporary, video, way |
Date time: | 1.00pm, Thursday 29th August, 2013 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | radwagon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
See clip at youtu.be/C8nOmhjLqrs
After the www.youtube.com/watch clip, we've now moved onto this. Is Addenbrookes ripping out segregated route and replacing it with on road space? Or is this just a temporary measure whilst the path is replaced. Given the high kerb off the route, I'd suggest it's temporary.
I did take objection to the use of signs saying "Pedestrian Walkway" along the marked off lane. It's a cycleway, albeit shared-use.
Comments reflect the views of the original submitter only.