Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | corduroy, shareduse |
Date time: | 1.02pm, Wednesday 19th May, 2004 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | simon |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Simon Nuttall |
Area: | Cambridge |
They\'ve got the corduroy paving on this cycleway/footway the wrong way round!
The cords should be across the footway (foreground), and with the cycleway (on the right).
Comments reflect the views of the original submitter only.