Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | canal, path, rcn82, surface |
Date time: | 2.28pm, Tuesday 3rd September, 2013 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Runcorn |
A raised edge at transition between single and double paths after bridge
UPDATE 2019: #110399 shows this now fixed.
Comments reflect the views of the original submitter only.