Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | a59, bridge, canal, dualcarriageway, ncn62, sign, stairs, steps, transpenninetrail |
Date time: | 9.56am, Thursday 5th September, 2013 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Bootle |
The NCN62 connection to the canal path is via a flight of steps
Comments reflect the views of the original submitter only.