Category: | Cycleway: Other (infrastructure-related) |
Tags: | aberystwyth, bridge, ncn81 |
Date time: | 11.42am, Friday 18th October, 2013 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Aberaeron |
It's cycleable, but was this surface chosen to slow bikes down?
Comments reflect the views of the original submitter only.