Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | ncn5, rhyl |
Date time: | 11.46am, Monday 21st October, 2013 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Abergele |
NCN route 5 diverted until the opening of the Pont y Ddraig cycle bridge across Rhyl harbour the next day.
Comments reflect the views of the original submitter only.