Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 1.32pm, Saturday 11th January, 2014 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | cmd1001 |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
This image shows how far a cyclist joining the Guided Busway path from the Primrose Lane development in Impington has to protrude into the path to be able to see clearly cyclists heading towards Oakington, because of the noise barrier. (See also #56132 and #56133)
Comments reflect the views of the original submitter only.