Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | None |
Date time: | 1.10pm, Tuesday 18th February, 2014 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | hesterkw |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
This lifted flagstone has been re-seated after a complaint was raised. It no longer wobbles, but it is now not level with the rest of the paving.
Comments reflect the views of the original submitter only.