Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | edinburghtram, efn8, path, tramway |
Date time: | 11.02am, Saturday 26th April, 2014 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Edinburgh |
The cycleway alongside the tramway at Carrick Knowe
Comments reflect the views of the original submitter only.