Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | buslane, cathkinbraesroute, droppedkerb, gap, parkingbay, shareduse |
Date time: | 3.44pm, Friday 18th April, 2014 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Maybe it's not finished, maybe it's a mistake, but there's a gap in the border at the dropped kerb for cycle access to Allison Street and the gap is only a fraction of the length of the dropped kerb. There's no such gap in the marked car parking bay in the bus lane.
Comments reflect the views of the original submitter only.