Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | busstop, cambridge |
Date time: | 9.50pm, Monday 9th June, 2014 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | hesterkw |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Cycleway behind bus stop on Green End Road. The segregation here is very poor, but there is a dividing line between the pavement and the cycle lane, with the lane going behind the bus stop.
Comments reflect the views of the original submitter only.