Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | crossing, ncn22, portsmouth, staggered, toucan |
Date time: | 6.39pm, Saturday 7th June, 2014 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Portsmouth |
Multi-stage Toucan crossing on the route to Portsmouth ferry port
Comments reflect the views of the original submitter only.