Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | carparking, diagram1057, frost, giveway, millburnactivetravelroute, path |
Date time: | 11.59am, Friday 26th December, 2014 |
Time line: | Earlier | Later |
Facing: | South east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Caithness |
The start of the final piece of path to the Golden Bridge, but a big cycle symbol has been painted on an area of end-on car parking rather than in the middle of the useable road.
Comments reflect the views of the original submitter only.