Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cornwall, hayle, ncn3 |
Date time: | 2.24pm, Saturday 27th December, 2014 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Bodmin |
Dropped kerb (not at all obvious) from highway to shared-use footway (NCN route 3)
Comments reflect the views of the original submitter only.