Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | a82, narrow, northcircularlink, shareduse |
Date time: | 3.19pm, Wednesday 18th March, 2015 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Dunbartonshire |
Work underway on creating the Clydebank North Circular Link alongside the A82, approaching the bridge over the Duntocher Burn. The fence on the left has largely collapsed, which may explain the white edging line.
www.west-dunbarton.gov.uk/roads-parking-travel/road-safety/road-safety-walking-cycling/
Comments reflect the views of the original submitter only.