Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | big, nottingham, track |
Date time: | 4.48pm, Monday 30th March, 2015 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | alidmun |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Bulwell |
The turning to remain on the big track. Squeeze to get a two wheeled child trailer through.
Comments reflect the views of the original submitter only.