Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 11.35am, Thursday 2nd April, 2015 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | richardj |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cambridge |
Improved access to Cutter Ferry Path, see #28021 for situation before. The bollards have been 'thinned out' and the kerb is now flush.
Comments reflect the views of the original submitter only.