Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | barriers, bridge, busway, closed, fastlink, temporary |
Date time: | 3.03pm, Sunday 5th April, 2015 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
After objections, the Fastlink busway carriageway over the Clyde Arc bridge will now permit cycling. But the plastic barriers at each end will only be removed once the buses are due to start running.
Comments reflect the views of the original submitter only.