Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Event or temporary issue |
Tags: | twitterimport |
Date time: | 1.00pm, Friday 1st May, 2015 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | hesterkw |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Source URL: | https://twitter.com/hesterkw/status/594109206241910784 |
Credit: | Hester [Twitter username: 'hesterkw'] |
Area: | Cambridge |
Cycle path on West Cambridge currently closed. Temporary diversion has a proper surface!
It's narrow and shared with pedestrians, but it is smooth, without transitions and solid.
Only issue was on signage: while there was a way through, it wasn't obvious from a distance. I initially thought route was closed and they hadn't created a diversion, but what was really needed was a 'yes! It is still open!.
Comments reflect the views of the original submitter only.