Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: A problem that needs to be fixed |
Tags: | a33, broken, crossing, damage, endofcycleroute, endofroute, kerb, roundabout, shareduse, tactiles |
Date time: | 9.01am, Saturday 16th May, 2015 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Southampton |
An 'End of Route' sign where clearly the cycle route continues across the other side of the road, and no dropped kerb on one side of the crossing. Broken tactiles becoming a trip hazard.
Comments reflect the views of the original submitter only.