Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | ncn755, sign, strathkelvin, strathkelvinrailwaypath, surface |
Date time: | 12.18pm, Sunday 23rd August, 2015 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Bearsden |
Path surface does not join up on the Strathkelvin Railway Path, with an unsurfaced gap left between the tarmac and the mock railway track section under the canal bridge.
Comments reflect the views of the original submitter only.