Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Other (infrastructure-related) |
Tags: | bridge, ccn1, ccn3, footbridge, lift, linkbridge, stairs, steps, towncentre |
Date time: | 3.32pm, Sunday 23rd August, 2015 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Cumbernauld |
The cycle route goes into a lift to get up to the Linkbridge across Central Way.
Comments reflect the views of the original submitter only.