Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | a728, aikenheadroad, cyclelane, doubleyellows, dyl, trial |
Date time: | 3.29pm, Friday 11th September, 2015 |
Time line: | Earlier | Later |
Facing: | East |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The start of the experimental cycle lane in Aikenhead Road, with one solid and one broken line, hatching and stuck-on catseyes (except for the one that came unstuck).
More information at www.glasgow.gov.uk/index.aspx
There is some analysis at glasgowcycleinfra.blogspot.co.uk/2015/06/aitkenhead-road.html and www.darkerside.org/2015/06/gcc-seek-feedback-on-soft-segregation-experiment/
Comments reflect the views of the original submitter only.