Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | bellahouston-qeuh, droppedkerb, glasgowcycling, path, ramp, twitterimport, underconstruction, underpass |
Date time: | 2.30pm, Friday 30th October, 2015 |
Time line: | Earlier | Later |
Facing: | South west |
Added by: | andypreece |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Source URL: | https://twitter.com/twanduiv/status/660101506490892289 |
Credit: | Twan vanDuivenbooden [Twitter username: 'twanduiv'] |
Area: | Glasgow |
Working on better cycling access to the M8 underpass at Craigton Rd/Jura St #glasgowcycling t.co/iIvigzzCZd
Comments reflect the views of the original submitter only.