Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | ellenbrook, gmcc, ncn55, repair, salford, unitedutilities, vélocity, walkden, worsley |
Date time: | 10.06am, Friday 19th February, 2016 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | riccardo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Greater Manchester |
Upgraded NCN55 in Roe Green (the lower NCN on the map) By April 2016 - Cyclists going towards Walkden or Ellenbrook from Worsley will have a much better path here. www.salford.gov.uk/tyldesleyloopline.htm Also a 4.5 metre wide path heading toward Leigh on the guided busway www.tfgm.com/buses/Busway/Pages/default.aspx
Comments reflect the views of the original submitter only.