Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | kerb, shareduse |
Date time: | 6.55pm, Friday 8th April, 2016 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Dunbartonshire |
Shared-use footway starts without a dropped kerb. Never mind, it's fairly pointless and it can be joined at a junction further on for the more useful part (see #79992).
Comments reflect the views of the original submitter only.