Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | cyclesuperhighway, london |
Date time: | 2.52pm, Thursday 28th April, 2016 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | City of London |
This seems to be where the East-West Cycle Superhighway (opening in two days!) changes from one side of the Embankment to the other.
Comments reflect the views of the original submitter only.