Add to Gallery: | Add this photo to a Gallery |
Category: | A sign, usually on the cycleway network, indicating a route for cycling.: A problem that needs to be fixed |
Tags: | gmcc, manchester, mcc, planning, salford, salfordsigns, scc, velocity2025 |
Date time: | 8.48am, Monday 1st August, 2016 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | riccardo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Greater Manchester |
Eccles is very shy @SalfordCouncil
Overhanging vegetation. also the footpath is being blocked forcing people to walk in the cycle lane. Also reported on Fixmystreet www.fixmystreet.com/report/870693
Comments reflect the views of the original submitter only.