Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Other (infrastructure-related) |
Tags: | gmcc, manchester, mcc, planning, salford, salfordkerb, scc, velocity2025 |
Date time: | 8.52am, Monday 1st August, 2016 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | riccardo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Greater Manchester |
Fitzwarren Street has been traffic calmed but they've missed the dropped kerb at the end of Willow Ford close. Someone has tried to fix this.
Comments reflect the views of the original submitter only.