Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | gmcc, manchester, mcc, planning, salford, salfordsigns, scc, velocity2025 |
Date time: | 3.26pm, Saturday 13th August, 2016 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | riccardo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Greater Manchester |
Salford S Langwothy Rd pavement obliterated by creeping veg forcing pedestrians to migrate into path of cyclists. Exacerbated by temporary sign blocking bike path.
Comments reflect the views of the original submitter only.