Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | ncn756, ramp, southbank, underconstruction |
Date time: | 10.44am, Monday 29th August, 2016 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
Former steps on south bank path now replaced with ramp, still with surfacing to come. #84383 shows view from other end.
Updated view of completed path at #86785.
Comments reflect the views of the original submitter only.