Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | a50, blackbearpark, warringtonroute8 |
Date time: | 12.16pm, Saturday 17th September, 2016 |
Time line: | Earlier | Later |
Facing: | North east |
Added by: | peteowens |
Copyright: | Public domain |
Download: | View full-size original |
Area: | Birchwood |
End of Black Bear Park Greenway wherew it meets Kingsway (A50). Directon sign, but no dropped kerb.
Comments reflect the views of the original submitter only.