Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | absolutebollards, action-replace-design, busway, cambridge |
Date time: | 10.55am, Sunday 11th December, 2016 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | timbo |
Area: | Cambridge |
Link from the new cycleway by the busway to an industrial estate.
Comments reflect the views of the original submitter only.