Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | bank, cambridge, chisholm, moss, north, station, trail |
Date time: | 4.19pm, Saturday 18th February, 2017 |
Time line: | Earlier | Later |
Facing: | North |
Added by: | annalangley |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | anna@annalangley.eu |
Area: | Cambridge |
Access route from Moss Bank to Cambridge North Station under construction in February 2017.
Comments reflect the views of the original submitter only.